Search Results/Filters    

Filters

Year

Banks




Expert Group











Full-Text


Author(s): 

Issue Info: 
  • Year: 

    2017
  • Volume: 

    35
  • Issue: 

    1
  • Pages: 

    1-12
Measures: 
  • Citations: 

    1
  • Views: 

    57
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 57

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

DE P. | DUNNE E.J. | GHOSH J.B.

Journal: 

OPERATIONS RESEARCH

Issue Info: 
  • Year: 

    1997
  • Volume: 

    45
  • Issue: 

    2
  • Pages: 

    302-306
Measures: 
  • Citations: 

    1
  • Views: 

    183
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 183

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2015
  • Volume: 

    26
  • Issue: 

    4
  • Pages: 

    311-333
Measures: 
  • Citations: 

    0
  • Views: 

    488
  • Downloads: 

    251
Abstract: 

The concept of "complexity" is familiar to most of project's managers, but it is not comprehended in the same way. although the complexity highlights negative points, but it may bring positive advantages which support the project. Researches conducted on this field show that the understanding of "complexity" between the researchers is different and it is mainly depends on their points of view. In fact, many identified aspects of the complexity in the literature are related to the aims of the research. In this paper, an attempt was made to describe the positive / negative features of the complexity of project using three approaches research literature (manufacturing and project complexity), interviews (deep interview with 20 experts) and questionnaire. The research was conducted on the Complex product and system (CoPS) projects. in addition, WH question technique was used. In conclusion, a 5p model (Purpose, Product, Process, People, Peripheral) was introduced.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 488

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 251 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Author(s): 

Issue Info: 
  • Year: 

    2020
  • Volume: 

    146
  • Issue: 

    2
  • Pages: 

    0-0
Measures: 
  • Citations: 

    1
  • Views: 

    90
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 90

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 1 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    1388
  • Volume: 

    8
Measures: 
  • Views: 

    314
  • Downloads: 

    0
Keywords: 
Abstract: 

اجرای موفقیت آمیز پروژه های بزرگ بدلیل ریسک ها و پیچیدگی های حاکم برآن ها نیاز به ایجاد ساختارها و روش های نوینی دارد که امروزه در دنیا مورد توجه می باشند.

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 314

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0
Issue Info: 
  • Year: 

    2019
  • Volume: 

    9
  • Issue: 

    2
  • Pages: 

    291-311
Measures: 
  • Citations: 

    0
  • Views: 

    221
  • Downloads: 

    152
Abstract: 

Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible synergies or conflicts between them may increase or decrease the total complexity. In this paper, a model is proposed for measuring the aggregate complexity in the selection of project portfolios. A case study is presented to show the usefulness of the model and its applicability in practice. Moreover, several large-sized numerical examples have been tested showing the capability of the model to solve such problems in logical computational time.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 221

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 152 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Issue Info: 
  • Year: 

    2016
  • Volume: 

    3
  • Issue: 

    2
  • Pages: 

    101-112
Measures: 
  • Citations: 

    0
  • Views: 

    1877
  • Downloads: 

    0
Abstract: 

Construction projects have always been complex. By growing trend of this complexity, implementations of large-scale constructions become harder. Hence, evaluating and understanding these complexities are critical. Correct evaluation of a project complication can provide executives and managers with good source to use. Fuzzy analytic network process (ANP) is a logical and systematic approach toward defining, evaluation, and grading. This method allows for analyzing complex systems, and determining complexity of them. In this study, by taking advantage of fuzzy ANP, effective indexes for development of complications in large-scale construction projects in Iran have been determined and prioritized. The results show socio-political, project system interdependencies, and technological complexity indexes ranked top to three. Furthermore, in comparison of three main huge projects: commercial-administrative, hospital, and skyscrapers, the hospital project had been evaluated as the most complicated. This model is beneficial for professionals in managing large-scale projects.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 1877

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
Writer: 

Issue Info: 
  • End Date: 

    1395
Measures: 
  • Citations: 

    0
  • Views: 

    180
  • Downloads: 

    0
Keywords: 
Abstract: 

Yearly Impact:   مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 180

Issue Info: 
  • Year: 

    2012
  • Volume: 

    23
  • Issue: 

    1
  • Pages: 

    1-5
Measures: 
  • Citations: 

    0
  • Views: 

    313
  • Downloads: 

    130
Abstract: 

Evaluative and comparative analysis among educational projects remains an issue for administration, program directors, instructors, and educational institutes. This study reports a fuzzy complexity model for educational projects, which has two primary aspects (technical aspects and transparency aspects). These aspects may not be measured precisely due to uncertain situations. Therefore, a fuzzy graph-based model to measure the relative complexity of educational projects is presented that uses an aggregation operator to resolve conflict among experts with respect to a complexity relation. The model maps the fuzzy graph into a scaled Cartesian diagram that depicts the relative degree of complexity among projects. An illustrative example for several educational projects is demonstrated to present the application of the model.

Yearly Impact: مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic Resources

View 313

مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesDownload 130 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesCitation 0 مرکز اطلاعات علمی Scientific Information Database (SID) - Trusted Source for Research and Academic ResourcesRefrence 0
litScript
telegram sharing button
whatsapp sharing button
linkedin sharing button
twitter sharing button
email sharing button
email sharing button
email sharing button
sharethis sharing button